PROJECT References & Resources
Our Projects
EPC/EPC-M
Design, Procurement and Installation
Design, procurement and installation of HRS and hydrogen storage
Customer: Open Grid Europe, Germany’s largest gas transmission company
Location: Krummhörn, Germany
Project scope: to develop a hydrogen refuelling station (HRS)
LIFTE H2 Role: LIFTE H2 is the EPC provider for an HRS and hydrogen storage facility, which requires the integration into a system with an existing electrolyser, pipe racks and fuel cell.
Due to the unique customer demand and requirements, an off-the-shelf solution was not suitable; therefore, the HRS and hydrogen storage is a bespoke design provided by LIFTE H2.
Project Status: Commissioned in March 2025
Design, Construction and Maintenance
Design, Construction and Maintenance of an Hydrogen Refuelling Station in two phases
Customer: Beteiligungsgesellschaft Kreis Düren
Location: Düren, Germany
Project scope: to develop a hydrogen refuelling station for the region's fuel cell bus fleet.
LIFTE H2 Role: LIFTE H2, in partnership with Resato Hydrogen, is the EPC provider for the hydrogen refuelling station, which will initially provide >500 kg/day and then scale up to >1.000 kg/day.
As the EPC and project coordinator, LIFTE H2 delivers the technical design and works with multiple stakeholders, including the customer’s contractors for permitting activities, the local regulatory authority, and 3rd party contractors who deliver elements of the projects on our behalf
Project status: Commissioning Phase 1: Q4 2026, Phase 2: Q3 2027
Technical Concept for 100 MW Electrolyser
Technical Concept for 100 MW Electrolyser
Customer: Lorica Energiesysteme GmbH & Co KG
Project scope: Lorica 100 MW green hydrogen facility
LIFTE H2 Role: LIFTE H2 was commissioned to develop the first technical concept for a 100MW Green Hydrogen Production Facility. Our hydrogen specialists are developing the first technical concept for early-stage permitting, partnership and funding discussions, which includes equipment sizing, technology assessment, layout production, Process Flow Diagrams, emergency storage, and grid connection requirements.
The 100 MW hydrogen electrolysis project will be provided with green electricity via PPA. It will not connect to the Hydrogen Backbone or other pipelines, but will be liquified and transport the hydrogen to customers via rail.
Project Status: In Progress
Other Selected Project References
Engineering & Project Delivery
Owner’s Engineer designing a bespoke 12 kg/min ultra heavy-duty refuelling system for a mining client
Detailed engineering work for HRS OEM, customising systems to local and customer requirements
Product Development
Development of the LIFTE H2 product suite incl. highcapacity tube trailer and APM
Studies & Consulting
Feasibility study of HRS archetypes with various H2 sourcing methods incl. on-site electrolysis
Feasibility study for H2 extraction from Aluminium Chloride production waste gas for mobility use
Technical Review of Export System Modelling and Technical Concept on behalf of H2 Project Developer
Operations
Operations of a UK top-tier COMAH installation with exemplary availability, production & safety performance
Management of 300,000 tonnes p.a of Ammonia incl. transfer, storage and loading operations at px chemical park
Operations of Risavika LNG port, which has a capacity of 300,000 tonnes of LNG per year
Studies & Consulting
Pre-FEED support for the OSBL element of the Equinor H2H Saltend project
Front-end studies for refinery process utilising waste industrial CO2 & renewable H2 to produce SAF
Studies & Consulting
Concept study for 100MW Electrolyser in green hydrogen facility
Technical due diligence for the potential acquisition of a PET plant, UK
Managing concept phase to secure the supply of water for a new H2 unit on behalf of Equinor
Our Resources